Monday, 23 November 2015

Production Schedule: Version 1

As I enjoy organizing, creating the production schedule was natural for me and became my task. As a group we figured out the dates that worked best for us. Since we live quite far away from each other, the dates were far apart from each other, because we had to agree on dates that suited all three of us.
Below you can see our production schedule.


Production Schedule:

24th of November - Deciding on exact costume of the girl choosing her exact clothes and make-up (stereotypical girl, wearing pink possibly heels as well)  

26th of November - Creating the 3 photos that the girl will hold in the "Auchan scene" (taking pictures with the girl and her friends, guy/stalker wearing black in all of them. 

28th of November - Starting the filming procedure in Auchan (doing as many shots as possible in the Auchan scene) + filming the scene in the parking lot.

1st + 2nd + 3rd of December - Editing in class - seeing if there are any shots missing 

5th + 7th + 8th of January - finishing the exact costume and mise-en-scene of the psychologist and the girl - creating a contrast/binary opposition of what she used to look like and what she looks like now (creating this contrast with the use of make-up and costume)

9th of January - filming in the psychologists room (finish it and get all the shots) 

12th + 14th + 15th of January - editing of the psychologists room scene (fitting everything together and create a smooth transition) 

19th + 21st + 22nd of January - adding title sequence and idents on Pinnacle

No comments:

Post a Comment

All comments are moderated and reviewed by the blog owner before publication